OPEN EXCAVATION SAFETY

 

Safety is our number one priority.  A safe jobsite ensures personal safety for all team members.  A safe jobsite keeps costs down.  A safe jobsite means we all go home at the end of the day happy and healthy to our families.

 

When you arrive on the jobsite, you will notice all CLWSI employees’ wearing their PPE (Personal Protective Equipment).  We ask our valued customers to join us in our “Zero Incidents” safety goal for our jobsites by wearing their PPE.

 

 

 

 

UTILITY SERVICES

TRENCHLESS

OPEN EXCAVATION


OPEN EXCAVATION SERVICES


C&L OFFERS EXTENSIVE EXCAVATION & INSTALLATION SERVICES

We strive to provide an ever increasing level of service by being reliable, prompt, and courteous 24/7/365.

CLWSI is the best source for installation, maintenance, repair, and replacement of water distribution and sewer collection systems. We are constantly updating our fleet of resources to provide innovative solutions, such as EZ Valve, Pipe Bursting, and UV CIPP.

 

EZ VALVE INSTALLATION INFORMATION

 

CLWSI, is an authorized dealer and installer, working in conjunction with Ferguson Waterworks for the installation of the Advanced Valve Technologies EZ valve live line insertion system.

 

This Valve is an AWWA C-509 Gate Valve with a fully encapsulated resilient wedge for complete line shut off after the installation. Typical installation of this valve requires approximately 2 hours and does not require out of service notices to customers when installing the valve.

 

We are capable of:

  • Excavation to repair or replace Water or Sewer Mains
  • Repair or replace Sanitary Manholes
  • Replace Fire Hydrants, Valves,  and PRV’s

 

 

 

 

All Rights Reserved C&L Water Solutions